What is involved in the installation process?2019-05-02T20:45:14+01:00

With domestic EV chargepoints we will install a new circuit/cable from your existing consumer unit/electric meter location to the EV chargepoint location. We will then install the chargepoint at the end of this cable. If the EV charge point is remote from your property we will dig a trench and install ducting to take an armoured cable. Each location is different so contact us today for a free survey where we can talk you through the process.

How long will it take?2019-05-02T20:39:02+01:00

Installation of a wall mounted domestic EV chargepoint usually takes a day but each installation is different. We will work with you to ensure we minimise any disruption.

Are the works guaranteed?2019-11-13T17:35:48+00:00

All our work is guaranteed for 6 years under the NAPIT Work Guarantee Scheme. Details can be found on the NAPIT website by clicking here.

What areas do you cover?2020-08-16T15:45:15+01:00

We cover the South East including East Sussex, West Sussex & Kent.

How much will it cost?2020-03-10T19:21:18+00:00

The costs start from £200 with the maximum available government grant and basic electrical installation. Each site is different and therefore an initial survey is required, the survey is free and there is no obligation or hard sell. Just a quick look at the site and a chat to see how we can best meet your needs.

The proposed charging point location and its proximity to your electricity meter will also need to be considered. Our team will help you make the correct decision in terms of location and best value.